UK Geothermal Digital Working Group UK Geothermal Data Catalogue

Catalogue › Infrastructure & Networks

NESO Data Portal

National Energy System Operator (NESO) - publicly owned since Oct 2024, formerly National Grid ESO

Licence
Open Government Licence v3.0
Cost
Free
Account needed
No
Harvestable
Automated

What it contains

200+ datasets. Relevant: Embedded Register, Interconnector Register, historic and forecast demand (half-hourly), constraint breakdowns, carbon intensity, Future Energy Scenarios, TEC Register, generation mix.

When you need it

Not yet mapped to a project stage. The stage axis is a first pass against a draft matrix, and a record with no stage means nobody has placed it rather than that it is useful at none.

Coverage and detail

Geographic
GB
Nations
England, Scotland, Wales
Resolution
National / GSP / settlement period
Formats
CSV, JSON, XLSX
Update cadence
Real-time to annual, varies by dataset

Access and machine route

Licence as stated
NESO Open Data Licence (OGL-compatible; check per dataset)
Assertion source
as published by National Energy System Operator (NESO) - publicly owned since Oct 2024, formerly National Grid ESO
Protocol
CKAN + datastore SQL (PostgreSQL)
Endpoint
https://api.neso.energy/api/3/action/
Harvest note
yes-automated

Caveats

Tight rate limits require a throttled harvester. GB only. Transmission-level - for distribution capacity see I6.

Classification

Category
Infrastructure & Networks
Sub-category
3.2 Electricity networks & grid capacity
Assigned by
Stated by the source
Depth domain
Surface
Data form
Time series, Tabular
Evidence confidence
Not yet assessed. Only a person can set this.

How current this entry is

Last updated here
2026-09-22
Last checked against the holder
2026-09-07
Checked by a person
Not yet. Nobody has read this entry.
Catalogue id
neso-data-portal
Open at National Energy System Operator

Openly licensed. No account needed.

Resolved A server answered on 2026-09-08 and returned the expected page. Checked by automated request, not in a browser. A site can answer a script and still fail for a reader, so treat this as a weak signal.
Machine endpoint (CSV, JSON, XLSX) More from NESO This record as JSON Report a problem
National Energy System Operator (NESO) - publicly owned since Oct 2024, formerly National Grid ESO. NESO Data Portal. Accessed via UK Geothermal Data Catalogue, https://catalogue.geothermaluk.org/id/neso-data-portal/. Record neso-data-portal.